(605) 702-4932 Kitchen RemodelingSioux Falls Free consult

S/01Full kitchen remodel

The complete Sioux Falls kitchen remodel

When the cabinets sag, the layout fights you and the wiring predates microwaves, patching stops making sense. A full remodel starts from the studs and rebuilds the room properly.

Free design consult

Plan your new kitchen

Answer four short questions. A Sioux Falls remodeler calls to set a time.

By clicking ‘See my options,’ you agree that Kitchen Remodeling Sioux Falls and one local kitchen remodeling contractor may contact you at the number you provided, including by call or text, about your kitchen project. Calls and texts may use automated technology, artificial intelligence (AI), and artificial or prerecorded voices. Consent is not a condition of purchase. Message frequency varies. Message and data rates may apply. Reply STOP to opt out, HELP for help. See our Privacy Policy and Terms.

Open-plan kitchen with a long white island, wood lower cabinets, a wall oven and pendant lights over the counter

A full remodel removes everything down to the framing, fixes what the walls were hiding, and rebuilds the kitchen around the way your household actually cooks, eats and gathers. In Sioux Falls, most projects of this kind cost roughly $45,000 to $120,000 and take six to ten weeks of construction once materials arrive.

Signs your kitchen needs the full treatment

A dated look alone rarely justifies starting from the studs. A complete rebuild pays off when more than one of these describes your room:

  • The layout is the problem. The refrigerator door hits the island, the dishwasher blocks the only drawer stack, or the sink sits on the wrong wall for the window.
  • Cabinet boxes have failed. Particleboard bottoms that swelled under the sink, face frames pulling away, or cabinets too shallow for modern appliances cannot be saved by paint.
  • Systems are out of date. Two-prong outlets, a single overloaded circuit for the countertop, galvanized supply lines or an undersized gas line all point toward opening the walls.
  • You want a different relationship with the rest of the house. Joining the kitchen to the dining room or family room is a structural project, not a cosmetic one.

If only one of those applies, read our comparison of a refresh against a full remodel before deciding. Plenty of Sioux Falls kitchens with good bones need new counters, lighting and cabinet doors rather than a full tear-out.

What a complete remodel includes

A full remodel bundles a dozen trades into one sequence. A good bid lists each of them separately so you can see where the money goes.

Work What happens Typical share of budget
Design and drawings Measured plan, elevations, cabinet layout, lighting plan 4% – 8%
Demolition and disposal Cabinets, counters, flooring, drywall where needed, dumpster 3% – 5%
Framing and structure Closing doorways, new openings, headers or beams 0% – 12%
Plumbing New supply and drain lines, gas line changes, fixture hookups 5% – 10%
Electrical New circuits, outlets, under-cabinet and recessed lighting 6% – 10%
Cabinets and hardware Boxes, doors, drawers, organizers, installation 28% – 35%
Countertops and backsplash Templating, fabrication, install, tile 10% – 15%
Appliances Range or cooktop, oven, hood, refrigerator, dishwasher 10% – 18%
Flooring, drywall, paint Floor through the room, patching, finishes 6% – 10%

The cabinet share stays remarkably consistent across national studies and local bids. If a quote shows cabinets at 15% of a full remodel, something is missing or very low-grade.

What it costs in Sioux Falls

For our multi-state region, the magazine's 2025 study pegs a major midrange kitchen at roughly $80,850. That benchmark assumes a 200-square-foot kitchen with semi-custom cabinets, an island, laminate-or-better counters and new standard appliances. The upscale version, with custom cabinetry, stone counters and professional-grade appliances, comes in around $159,000 for the region.

Local projects often price below those figures because Sioux Falls kitchens tend to be smaller and many homeowners reuse sound flooring or keep the sink where it is. Here is how full remodels usually break out by finish level:

Finish level Typical Sioux Falls range What it looks like
Builder-plus $45,000 – $65,000 Stock or semi-stock cabinets, quartz, same footprint
Midrange $65,000 – $95,000 Semi-custom cabinets, island added, new appliance package
Upscale $95,000 – $140,000 Custom cabinetry, layout changes, premium stone
Signature $140,000 and up Designer-led, panel-ready appliances, structural work

Taxes shape the number too: the state collects 2% of every remodeler's billings, and in-town purchases of fixtures and finishes pick up 6.2% sales tax. Try the cost estimator to see how size and finish choices move the total.

Permits and the trades who pull them

Because a full remodel touches plumbing, wiring and often walls, it almost always needs city permits. The room you finish will be inspected to today's editions, the 2021 residential and 2023 electrical codes, no matter how old the rest of the house is.

The city also controls who can do the work. Your general remodeler must hold the city's residential building credential. Plumbing must be done by a city-licensed plumbing contractor who also holds a state master plumber license, and electrical work requires a state license plus a city Class B license for residential jobs. Owner-occupants of detached homes are technically allowed to do their own wiring under permit, though very few take that on for an entire kitchen.

Our permit guide covers what each permit involves, the inspections to expect, and the floodplain permit some riverside properties need even for cabinets and counters.

The order of work, week by week

Every remodel varies, but a full Sioux Falls kitchen usually follows this rhythm once demolition starts:

  1. Week 1: Protection of floors and doorways, demolition, dumpster out, inspection of framing and subfloor.
  2. Weeks 2–3: Framing changes, rough plumbing and electrical, ductwork for a new hood, then rough-in inspections.
  3. Week 4: Insulation where exterior walls were opened, drywall, tape and mud.
  4. Weeks 5–6: Flooring if it runs under the cabinets, then cabinet installation and leveling.
  5. Week 7: Countertop templating, followed by fabrication, which typically takes one to three weeks.
  6. Weeks 8–10: Counter install, backsplash, plumbing and electrical trim, appliances, final inspection and punch list.

The biggest scheduling risk is not construction but ordering. Semi-custom cabinets commonly take six to ten weeks to arrive, and custom shops can be longer. A remodeler who orders cabinets before demolition can cut a month from the time you live without a kitchen. Our timeline guide covers the full calendar, including the best months to start.

Details worth getting right in this climate

Sioux Falls winters shape a full remodel in ways a national checklist misses.

Exterior-wall plumbing. A sink under a window on an outside wall is classic, but a supply line in a poorly insulated exterior wall can freeze on a subzero night. When the wall is open, ask for the lines to be kept on the warm side of the insulation, or for the wall to be insulated properly with an air seal behind the sink base.

Range hood makeup air. Powerful hoods pull a lot of air out of a tight house. In a cold climate that air has to come from somewhere, and big hoods can trigger makeup-air requirements under the residential code. Your remodeler should size the hood for your cooktop and your house, not just pick the biggest number.

Wood movement. Dry, heated winter air and humid summers make solid wood expand and contract. Quality cabinet doors use engineered panels or floating centers that tolerate the swing, and painted doors on MDF cores avoid the hairline cracks that can show at joints on painted solid wood.

Water. The city's water is very hard, so build in a filtered water line and talk with your plumber about a softener before the walls close. Scale shortens the life of dishwashers, ice makers and instant hot-water dispensers.

Kitchen mid-renovation with plastic sheeting over the doorway and cabinets partly installed
Dust protection and a clear sequence keep a full remodel livable

Living through it

A full remodel means four to ten weeks without a working kitchen. The usual workaround is a pop-up station in the dining room or downstairs: the former fridge, a countertop cooker or two and a folding table. Paper plates help. If your basement already has a wet bar, the remodel is a good moment to make that space a little more capable; our lower-level kitchen page explains the options.

Ask how the crew will handle dust. Zip walls, floor protection and negative-air fans are standard on careful jobs, and they matter more in winter when windows stay shut.

How to compare full-remodel bids

When two bids differ by $20,000, the reasons are usually in the details. Line them up and check:

  • Whether both include the same cabinet line and construction, such as plywood boxes versus particleboard and full-extension soft-close drawers versus basic slides.
  • Allowances for counters, tile, lighting fixtures and hardware, and whether those allowances are realistic for what you picked.
  • Who pays for permits and inspections, and whether disposal is included.
  • What happens if demolition reveals rot, knob-and-tube wiring or a beam that needs upgrading.
  • The payment schedule, the warranty on workmanship and the remodeler's city license number.

Then ask both contractors the same question: what would you do differently in this kitchen? The answer tells you who listened during the walk-through.

FAQ

Common questions, answered

Quick answers for this topic. Our full Sioux Falls kitchen FAQ has more than a hundred.

How long does a full kitchen remodel take in Sioux Falls?

Construction usually runs six to ten weeks once cabinets are on site, and the whole process from first meeting to final punch list is often three to four months. Design decisions and cabinet lead times account for most of the time before demolition, so ordering early shortens the stretch without a kitchen.

Can I stay in my house during a full remodel?

Most people do. You lose the kitchen, not the house, and a temporary setup with a microwave, hot plate and the old refrigerator covers basic meals. Good dust control with plastic walls and floor protection keeps the rest of the home livable.

What is the biggest hidden cost in a full remodel?

Surprises behind the walls. Older Sioux Falls homes can hide undersized wiring, galvanized pipe or framing that needs reinforcing for a new opening. A contingency of 10% to 15% of the construction budget covers most of these without derailing the project.

Do I have to replace my flooring too?

Not always, but it is usually smart. New cabinets rarely match the old footprint exactly, which leaves gaps in the floor. Many remodelers install new flooring first and run it under the cabinets, which also makes a future layout change easier.

Is a full remodel worth it if I might move in five years?

It can be, if you keep the scope in line with the neighborhood. A midrange remodel that fixes a bad layout tends to help a sale more than an upscale project with luxury appliances. Remodeling's 2025 report shows large upscale kitchens recovering a smaller share of their cost at resale.

Who handles the permits?

Your licensed remodeler normally pulls the building permit, while the licensed plumber and electrician pull their own permits for their work. Ask who is responsible in the contract, and make sure final inspections are signed off before the last payment.

Can I supply my own appliances or cabinets?

Many remodelers allow owner-supplied appliances. Owner-supplied cabinets are less common because the installer cannot warranty products they did not order. Be aware that under South Dakota rules a prime contractor's excise tax can apply to the value of materials the owner furnishes, so ask how your bid handles that.

What should I decide before demolition starts?

Everything that affects rough-in: the appliance models and their dimensions, the sink and faucet, the hood, and the lighting layout. Changing a range from 30 to 36 inches after the gas line and outlets are roughed in costs time and money.

Next step

Tell us what the kitchen needs

Share a few details and one local kitchen remodeler will call to set up a design consultation at your home. You receive a written, line-by-line bid and decide from there.

  • No cost for the consult
  • Cabinets, counters, layout and permits covered in one conversation
  • Prefer the phone? (605) 702-4932

Request a consult

About a minute

By clicking ‘Request my consult,’ you agree that Kitchen Remodeling Sioux Falls and one local kitchen remodeling contractor may contact you at the number you provided, including by call or text, about your kitchen project. Calls and texts may use automated technology, artificial intelligence (AI), and artificial or prerecorded voices. Consent is not a condition of purchase. Message frequency varies. Message and data rates may apply. Reply STOP to opt out, HELP for help. See our Privacy Policy and Terms.

CallFree consult